The balustrade made by Peter - I did not want turned spindles for this building. |
Maybe more tweaking to be done - but not until the whole thing is together! |
Ground floor window and door frame installed. |
The balustrade made by Peter - I did not want turned spindles for this building. |
Maybe more tweaking to be done - but not until the whole thing is together! |
Ground floor window and door frame installed. |
All the timber framing on ready for claying |
Other side clayed |
Brickwork completed on chimney stack |
Showing the completed chimney stack |
Showing the complete chimney painted |
The light was not so good for taking photos - but more paintwork done on these pieces |
Light Peter has made for this building. He will be making all the lights for this - thankfully, then I can have what I want! |
The front now ready for claying. Timber framing completed so ready to move on. The door still needs painting. |
"Hardware" ready for painting |
Ground floor fireplace - some painting commenced |
Parts assembled ready for the fun stuff |
The original doesn't have a chimney so I made one fit. |
Do you like the clamps - very technical!! |
All the parts ready to go!! |
Some of the timber, distressed and painted |
Getting ready to clay! |
Inside walls clayed and ready to paint. Waiting for the clay to dry a little more!! |